We now have concrete on the floor. That has to cure for a few days.
Now that I have concrete, I was able to begin moving things back into the storage room. In this case, I moved two shelves that were blocking the door to the bike area. I can now access that way again.
There's still lots to shuffle about, but I'm also tuckered. I'm coming out of the coldish thingie, but I only worked half a day.
The contractor will glue down the floor on Friday or Monday, depending on his schedule.
Now that I have concrete, I was able to begin moving things back into the storage room. In this case, I moved two shelves that were blocking the door to the bike area. I can now access that way again.
There's still lots to shuffle about, but I'm also tuckered. I'm coming out of the coldish thingie, but I only worked half a day.
The contractor will glue down the floor on Friday or Monday, depending on his schedule.